Installation and commissioning of AKE-02R system (neutron power on-line calibration) at Bohunice NPP
19th Symposium of AER on VVER Reactor Physics and Reactor Safety (2009, Varna, Bulgaria)
Core Surveillance and Monitoring
Abstract
Replacement of ex-core neutron flux measurement system AKNT-2 at Bohunice NPP was finished at Unit 3 in 2007 and at Unit 4 in 2008. The previous system was replaced by new system AKNT-17R. Neutron power on-line calibration system AKE-02R was installed at Unit 3 in the last year 2008. AKE-02R was working in open-loop till to end of fuel cycle. AKE-02R system was also installed at Unit?4 during outage in 2009 (July 2009).